Files and troubleshooting
Saving, undo and revisions
How BIMIQ saves your work, and what to do when a newer revision exists.
Saving
BIMIQ saves as you work. The save status in the workspace shows when a change has not been saved yet.
Undo and redo
Undo (Ctrl Z) and Redo (Ctrl Shift Z) step through recent changes. Up to 40 steps are kept per session.
A newer revision is available
If someone else saved the project after you opened it, you see Newer revision available. Choose Resolve the newer revision before you continue, so your changes don't overwrite theirs.